leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en Tue, 27 Dec 2022 07:38:26 +0000 en-US hourly 1 http://wordpress.org/?v=4.6.1 leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/1765 http://luxury-curtains.com/en/cases/1765#respond Tue, 27 Dec 2022 07:38:26 +0000 http://luxury-curtains.com/?p=1765 Sorry, this entry is only available in 涓枃.

]]>
http://luxury-curtains.com/en/cases/1765/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/1236 http://luxury-curtains.com/en/cases/1236#respond Thu, 20 Aug leyu乐鱼 01:40:54 +0000 http://luxury-curtains.com/?p=1236 Sorry, this entry is only available in 涓枃.

]]>
http://luxury-curtains.com/en/cases/1236/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/1313 http://luxury-curtains.com/en/cases/1313#respond Sun, 22 Dec 2019 10:47:26 +0000 http://luxury-curtains.com/?p=1313 Sorry, this entry is only available in 涓枃.

]]>
http://luxury-curtains.com/en/cases/1313/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/570 http://luxury-curtains.com/en/cases/570#respond Thu, 07 Dec 2017 02:38:41 +0000 http://luxury-curtains.com/?p=570 Sorry, this entry is only available in 涓枃.

]]>
http://luxury-curtains.com/en/cases/570/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/300 http://luxury-curtains.com/en/cases/300#respond Tue, 21 Jun 2016 03:06:32 +0000 http://luxury-curtains.com/?p=300 Continue reading "Project: 5th stage dynamic technique impro??vement project of Luxi Chemical Group Co., Ltd"]]> 20150902

Project

5th stage dynami???c technique improvement project of Luxi Chemical Group Co., Ltd

Constructing company

Luxi Chemical Group Co., Ltd

Equipping plan

two pulverized coal boilers of high temperature and high pressure at 680t/h and on?e B90MW back-pressure turbo generator

Working range

feasibility study, primar?y designing, working drawings and completing drawin??g designing.

Period of project

2014

]]>
http://luxury-curtains.com/en/cases/300/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/153 http://luxury-curtains.com/en/cases/153#respond Mon, 09 May 2016 12:21:17 +0000 http://luxury-curtains.com/?p=153 Continue reading "City Grid re??const?ruction project of Huhehaote, Inner Mongolia Electricity Board"]]> 201605092001 201605092002

Project

City Grid reconstruction project of Huhehaote, Inner Mon??golia Electricity Board

Constructing company

Huhehaote, Inner Mongolia Electricity Sup?ply Co., Lt?d

Equipping plan:

circuit route planning and put underground

Working range

primary ?drawings, working drawings and completi??ng drawing designing

Period of project

2013

Project introduction

The project was finished in December 2013. 15-kilometer City Grid is designed. mainly involving 35k?V and 10kV circuits and partial 110kV circuits, as an important project of city grid upgrade and reconstruction of Huhehaote Electricity Board

]]>
http://luxury-curtains.com/en/cases/153/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/149 http://luxury-curtains.com/en/cases/149#respond Mon, 09 May 2016 12:18:57 +0000 http://luxury-curtains.com/?p=149 Continue reading "S?econdary pressure-reducing reconstructing project of?? Ji Steel"]]> 201605091902 201605091901

Project

Secondary pressure-reducing reconstructing project of J??i Steel

Constructing company

Shan Steel Group

Equipping plan

110kV AIS transformer station converted to ??????????????????????????GIS one

Working range

working drawings and completing drawings

Period of project

2011

Project introduction

The project has been put into use since November 2011. The outd??oor AIS transformer station of ji Steel was conver?ted to an indoor GIS transformer station with 300-meter cable tunnel at the same time, as a pivotal project of secondary pressure-reducing upgrade and reconstruction and cables buried underground.

]]>
http://luxury-curtains.com/en/cases/149/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/145 http://luxury-curtains.com/en/cases/145#respond Mon, 09 May 2016 12:16:25 +0000 http://luxury-curtains.com/?p=145 Continue reading "220k?V pr?essure-increasing project of Dongming Plastic"]]> 201605091802 201605091801

Project

220kV pressure-increasing project ?of Dongming Plastic

Constructing company

New Hope Group

Equipping plan

220??kV pressure-increasing station and distributing circuits

Working range

primary drawings, working drawings and co?mpleting drawing designing

Period of project

2014

Project introduction

40-kilometer 220kVcircuits are designed and one transformer station of 220/22kv as a tran?smission project of Chemical3 and 4 sets of Dongming,?? Xinjiang Plastic.

]]>