leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en Tue, 27 Dec 2022 07:38:26 +0000 en-US hourly 1 http://wordpress.org/?v=4.6.1 leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/1236 http://luxury-curtains.com/en/cases/1236#respond Thu, 20 Aug leyu乐鱼 01:40:54 +0000 http://luxury-curtains.com/?p=1236 Sorry, this entry is only available in 涓枃.

]]>
http://luxury-curtains.com/en/cases/1236/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/570 http://luxury-curtains.com/en/cases/570#respond Thu, 07 Dec 2017 02:38:41 +0000 http://luxury-curtains.com/?p=570 Sorry, this entry is only available in 涓枃.

]]>
http://luxury-curtains.com/en/cases/570/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/300 http://luxury-curtains.com/en/cases/300#respond Tue, 21 Jun 2016 03:06:32 +0000 http://luxury-curtains.com/?p=300 Continue reading "Project: 5th stage dyn???amic technique improvement project of Luxi Chemical Group Co., Ltd"]]> 20150902

Project

5th stage dynamic technique imp?rovement project of Luxi Chemical Group Co., Ltd

Constructing company

Luxi Chemical Group Co., Ltd

Equipping plan

two pulverized coal ??boilers of high temperature and high pressure at 680t/h and one B90MW back-pressure turbo generator

Working range

feasibility study, primary designing, w??orking drawings and completing drawing designing.

Period of project

2014

]]>
http://luxury-curtains.com/en/cases/300/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/95 http://luxury-curtains.com/en/cases/95#respond Mon, 09 May 2016 11:18:46 +0000 http://luxury-curtains.com/?p=95 Continue reading "Thermal power statio????n designing project of Shangdong Quanlin Straw Multipurpose Co., Ltd"]]> 2016050904

Project

thermal powe??r station designing pro?ject of Shangdong Quanlin Straw Multipurpose Co., Ltd

Constructing company

Shangdong Quanlin Straw Multipurpose Co., Ltd

Equipping plan

three pulverized coal boiler of high temperature and high pressure at 520t/h and one 125MW extraction condensing turbine and one 60MW combined heat generator set of extr?action-back?-pressure turbo generator. One boiler and one generator are considered to be expanded when designed.

Working range

primary designing, workin??g drawings and completing drawing designing.

Period of project

2013

]]>
http://luxury-curtains.com/en/cases/95/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/91 http://luxury-curtains.com/en/cases/91#respond Mon, 09 May 2016 11:14:26 +0000 http://luxury-curtains.com/?p=91 2016050903

Project

first stage heating? project of Ningxia Xin Er Tai Xing Da Energy Co., Ltd

Constructing company

Ningxia Xin Er Tai Xing Da Energy Co., Ltd

Equipping plan

two pulveri?zed coal boilers of high temp??erature and high pressure at 260t/h and two C70MW extraction condensing turbines

Working range

EPC overall contracting

Period of project

2014

]]>
http://luxury-curtains.com/en/cases/91/feed 0
leyu乐鱼(中国)责任有限公司 http://luxury-curtains.com/en/cases/42 http://luxury-curtains.com/en/cases/42#respond Sun, 24 Apr 2016 07:06:10 +0000 http://luxury-curtains.com/?p=42 Continue reading "Combined heat and power project of H??e Bei Xin Xin Yuan Energy? Inc."]]> 2016050901
Project Overview

Project: Combined ??heat and power project of He Bei Xin Xin Yuan ??Energy Inc.

?Constructing Compa??ny: He Bei Xin Xin Yuan Energy Inc.

Equipping plan: one pulverized coal boiler of high temperature ??and high pressure at 15??0t/h and one CB30MW extraction-back-pressure turbo generator.

Working range: feasibility study, pri?mary designing, working drawings and completing drawing designing.

Period of project: August 2014-March 2016

Combined heat and power project of He Bei Xin Xin Yuan Energy Inc.is located in the Petrochemical Zone of Bohai New District Zongjie Industry Zone, Cangzhou, Hebei province. As a project to centrally supply heat with steam as the heat source for the Petrochemical Zone of Bohai New District Zongjie Industry Zone, 2 pulverized coal boilers of high temperature and high pressure at 150t/h and one CB30MW extraction-b?ack-pressure turbo generator set are planned with one boiler and one generator at the first stage.

The project provides 492,9 million KWH/year? by using Limestone gypsum method and wet ESP to desulfurize and SCR to denitrate, therefore keeping pollutant SO2 emission standard鈮?mg/Nm3, dust and soot standard 鈮?mg/Nm3銆丯Ox standard鈮?0mg/Nm3

In this project, we use pulverized coal boilers of high temperature and high pressure at 150t/h of Wuxi?? Guanghua ??Boiler Inc, extraction-back-pressure turbo generators of Hangzhou Steam Turbine Inc and turbo generators at 30MW of Shandong Jinan Generating Equipment Co., Ltd. as our electricity generators

]]>
http://luxury-curtains.com/en/cases/42/feed 0